Skip to content

Underground Stations in Düsseldorf: Now Asbestos-Free

Station Access at Nordstraße U-Bahn Remains Blocked Since May 21 Evening; U78 and U79 Trains Continue Their Journey

Düsseldorf Announces More Asbestos-Free Subway Stations
Düsseldorf Announces More Asbestos-Free Subway Stations

Underground Stations in Düsseldorf: Now Asbestos-Free

In the heart of Berlin, a recent discovery of asbestos contamination at the U-Bahn station Nordstraße has caused a stir. Here's what we know so far.

The contamination was uncovered during renovation works at the station, but the source of the asbestos remains a mystery. As a precautionary measure, access to Nordstraße has been blocked since May 21st.

Passengers are advised to use alternative stations, such as Ergo Platz/Klever Straße or Heinrich-Heine-Allee, as parallel tests at these stations showed no asbestos contamination. The same results were found in the interior of the U-bahns when tested with closed windows.

Safety measures have been put in place at Nordstraße. The city and Rheinbahn have isolated the distribution level from traffic with foil, and Rheinbahn security personnel ensure all windows in the U-bahns are closed when passing through the station.

Announcements in both German and English on the U-bahns ask passengers to keep windows closed during the affected section. Meanwhile, Rheinbahn drivers open all doors on the platform side at all other stations of lines U78 and U79 to allow fresh air into the wagons.

Further samples were taken at U-Bahn station Bordstraße on May 27th, and they are currently being analyzed in the lab. For the most accurate and up-to-date information, it's recommended to check official statements from the Berlin transportation authority (BVG) or contact local environmental or health offices.

As of now, there is no publicly available detailed update specifying the current status of asbestos contamination at Bordstraße. The timeline for when the results will be available depends on the testing laboratory's processing time and local authorities’ communication schedules. Generally, asbestos sample analysis can take anywhere from a few days to a few weeks.

Measurements on the surface of the construction site at Fischerstraße also showed no signs of contamination, reinforcing the safety measures in place. The U78 and U79 U-bahns are not stopping at Nordstraße due to the asbestos contamination, and passengers are advised to plan their journeys accordingly.

In conclusion, while the source of the asbestos contamination at Nordstraße station remains unknown, the city and Rheinbahn are taking necessary steps to ensure passenger safety. Regular updates will be provided as more information becomes available.

  1. The contamination incident at the Nordstraße U-Bahn station has drawn attention to the importance of environmental science, especially when it comes to identifying and managing medical-conditions like asbestos exposure.
  2. As the city of Berlin and Rheinbahn work diligently to address the asbestos contamination issue at Nordstraße, health-and-wellness initiatives should also be considered to ensure the long-term safety of passengers and the wider community.

Read also:

    Latest